Modernisation of the formulation
development laboratory
and the pilot plant

arrow

Learn more

Summary

The project aimed to reconstruct and modernise the GMP pilot production area and the formulation development laboratory with a total area of ​​approximately 1,000 to 1,200 m2. Due to the expected technological break, before the renovation work began, a safety stock supply for commercial products was manufactured, and laboratory work was partially moved to a temporary area. After the renovation, critical installations (i.e. HVAC, purified water, compressed air and nitrogen) and technological devices were requalified.

The project ended when the GMP certificate for the modernised area was renewed. As a result, the production efficiency of the pilot zone was increased, and the ergonomics of work in the laboratory area were improved.

Key points:

Construction and implementation design

Selection of a general contractor

Construction work

Periodical progress updates to key stakeholders

Requalification of the modernised area

GMP certification